• 5 Steps to compliance

    Making your BWMS future proof

In need of a compliant BWMS?  5 Steps to get you there.

IMO's deadline for all vessels to be equipped with compliant ballast water treatment systems is approaching rapidly. By 8 September 2024 all ships should meet the newest D2 standard. Selecting the right type of ballast water management system (BWMS), getting it installed and commissioned correctly, or retrofitting existing solutions often pose tricky challenges and a lot of specialist work. As Wärtsilä Water & Waste we help our customers get their BWMS compliant by walking them through following five steps:

IMO regulation and deadline for D2 compliant BWMS; Five steps to compliance

STEP 1

right arrow 5 steps

Data collection & BWMS selection

Obtain the relevant vessel data such as pump capacity, operational profile, class, flag and other pertinent data to allow suitable options to be selected for equipment type, size and scope of supply. If requested we can supply a high level feasibility study outlining the options to the customer at this early stage.

STEP 2

right arrow 5 steps

Vessel survey, 3D scan & design

Attend vessel to conduct 3D laser scan of the proposed installation site. This enables development of full mechanical + electrical engineering documents and system installation. Next steps: full planning of tie-ins to existing pipework, avoiding clashes with existing structure/equipment and identifying suitable equipment locations. Design phase can include all required documentation for class plan approval to ease burden on customer and simplify the process.
Outside of main pipework penetrations, some of this work can be conducted prior to drydock phase to shorten needed drydock time.

STEP 3

right arrow 5 steps

Procurement & manufacturing

All the equipment, required pipework, valves, cabling and other required scope is manufactured and delivered ready for the system to be fitted to the vessel. Wärtsilä Water & Waste works with several trusted partners on the installation scope, all of whom have a wide range of experience in fitting such systems.
During this phase there will also be prefabrication of the required base frames, mountings and associated fixings needed for the installation.

STEP 4

right arrow 5 steps

Installation

Transfer of materials onto the vessel and installation of the system following the design concept.
Several options: installation by yard with supervision, or by trusted Wärtsilä partner. In both cases the installation design plan will be followed. All wiring will be completed, and power taken from a new or existing breaker on the vessel. The system then goes through an installation readiness check, prior to commissioning.

STEP 5

right arrow 5 steps

Commissioning

Final stage. Carried out on board, by Wartsila or a trusted partner. Includes dry& wet commissioning, demonstration to class and some crew training on operating and maintaining the system.
Optional: commissioning testing by a laboratory, carried out with required independence & impartiality to give owner confidence in system's performance.

Staying compliant

With the treatment system in use, the vessel can now operate with the knowledge that the ballast water discharge meets all required regulations. To help ship owners and operators remain compliant over the longer term, Wärtsilä is providing full lifecycle support, based on a complete range of services. These will assist owners and operators in maintaining and operating a compliant system. Compliance against certification relies on the system being correctly maintained and having type approved components fitted, according to the OMSM.

What do we offer?

  • OEM spares for each Aquarius® system, globally distributed
  • Reagents and consumables for continuous operation, supplied rapidly
  • Service attendance for any repairs that the crew are confident to do themselves
  • Health checks and annual servicing, if required by the vessel operator, where the crew does not wish to carry out the work themselves
  • Remote assistance in case of any operational issues with the system

Wärtsilä Water & Waste has the capability, thanks to a state of the art distribution facility, to deliver any required spares quickly and reliably. In addition, our expert teams are able to remotely assist in diagnosing any problems.

Contact us

Please fill in the form, we aim to respond within 1-2 business days depending on the enquiry. For an existing installation, provide all necessary details to identify the installation and the equipment. Fields indicated with an asterisk (*) are required.

 

For NEWBUILD & RETROFITS, please contact +44 1202 662 600 or ballastsales@wartsila.com.

For SPARE PARTS, please e-mail us with the Equipment Serial Number or the name of the vessel at pse@wartsila.com. For urgent support, contact +44 1202 662 600.

For TECHNICAL SUPPORT & SERVICE, please email us with the Equipment Serial Number or the name of the vessel at poole.service@wartsila.com. For urgent support, contact +44 1202 662 600.

Equipment Serial Number is taken from the equipment nameplate and includes all letters and numbers as given on the equipment nameplate.