Leading the energy transition

Wärtsilä leads the transition towards a 100% renewable energy future. We help our customers in decarbonisation by developing market-leading technologies. These cover future-fuel enabled balancing power plants, hybrid solutions, energy storage and optimisation technology, including the GEMS energy management platform. Wärtsilä Energy’s lifecycle services are designed to increase efficiency, promote reliability and guarantee operational performance.

Our track record comprises 79 GW of power plant capacity and more than 115+ energy storage systems delivered to 180 countries around the world.

 

 

Towards a 100% renewable energy future

We are in the midst of the transition towards a 100% renewable energy future, a world where homes and businesses are powered in a sustainable way. No one person or company alone can change the world overnight. No single, brilliant move will complete the game. It’s something we all need to do together.

Our proudest numbers

79 GW

of power plant capacity installed.

115+

energy storage installations delivered.

99.1 %

annual reliability for power plants operated by Wärtsilä.

Market-leading solutions for energy

Esc image
Every second counts in the energy transition

Fast, flexible balancing power is essential for the energy transition. Learn how flexibility can be added to power systems

Learn more

Latest press releases and news

Wärtsilä has delivered a 125 MW / 250 MWh energy storage system to REV Renewables to support grid stability and meet decarbonisation goals in California

Feb 21, 2023, 17:00 by Wärtsilä Corporation

The technology group Wärtsilä reached substantial completion on a 125-megawatt (MW) / 250-megawatt hour (MWh) energy storage system in Calexico, California, USA, for REV Renewables, to help stabilise and decarbonise the electric grid. The facility, called the LeConte energy storage project, is Wärtsilä’s second largest Engineering, Procurement, and Construction (EPC) project to date.

Wärtsilä completed construction just in time to provide grid stability during California’s record-setting September 2022 heat wave. The California Independent System Operator (CAISO) confirmed in their Summer Performance Report for September 2022 that 2,000 MW of energy storage were dispatched to support the grid on September 5th during the most grid challenged period of the heat wave, helping California avoid widespread power outages. 

The LeConte system was approved by the California Public Utilities Commission in early 2022 as part of a plan to build 15,000 MW of new energy storage and demand response resources by 2032 to ensure long-term reliability and meet the state’s Renewables Portfolio Standard. The energy storage system for REV Renewables helps fulfil the resource adequacy obligations of California utilities and supports various ancillary efforts for CAISO.

Located near the California/Mexico border, the LeConte facility is situated at a major junction point for energy producers in the CAISO and San Diego Gas & Electric territories that are importing and exporting energy between the U.S. and Mexico. Moreover, the facility will be used to follow the automatic generation control signal to maintain system frequency and perform peak day operations to relieve congestion on transmission lines from the abundance of solar photovoltaic resources in the area.  

“Battery energy storage is a key component to maintaining reliability and stability of California’s electricity grid,” said Cody Hill, REV Renewables Senior Vice President, Battery Systems. “Wärtsilä worked with us to manage supply chain challenges, to collaborate with local communities and to perform site safety and training to bring this complex energy storage project online.”

REV Renewables is a leader in the development, ownership and operations of energy storage and renewable generation assets and owns the largest deregulated portfolio of energy storage assets in the U.S. This is Wärtsilä's first agreement with REV Renewables, resulting from more than a decade of combined business development efforts across Wärtsilä North America and Wärtsilä Energy Storage & Optimisation.  

“We’re pleased to be partnering with REV Renewables on our second largest EPC project, which will be instrumental for the state’s decarbonisation goals. Adding flexible generation such as energy storage to Southern California is significant as the area is important for stabilising the supply of electricity on transmission lines between Mexico and California,” said Andrew Tang, Vice President of Energy Storage & Optimisation, Wärtsilä. “This facility will support the continued integration of renewable energy assets on California’s electric grid.”

The project includes Wärtsilä’s GridSolv Quantum, a fully integrated, modular and compact energy storage system, as well as the GEMS Digital Energy Platform, Wärtsilä’s sophisticated energy managementsystem. Wärtsilä’s GEMS Digital Energy Platform provides a critical safety featureby continuously monitoring to pinpoint and isolate any system malfunctions automatically. It will be maintained and optimised with Wärtsilä’s Service+ solution, a suite of comprehensive lifecycle solutions applicable for energy storage systems including scheduled maintenance services and extended warranties.

Learn more:

Wärtsilä’s Energy Storage and Optimisation Technology

Wärtsilä Energy in the US

Path to 100% Renewables for California

Media contact for more information on this release:

Jost Ehrnrooth
Marketing & Communications Coordinator
Wärtsilä Energy
Mob: +358400 988622
jost.ehrnrooth@wartsila.com

Image Caption: Wärtsilä’s energy storage technology enables REV Renewables to support grid stability, ensure resource adequacy and capitalise on ancillary services in California ISO © Wärtsilä Corporation

All Wärtsilä releases are available at https://www.wartsila.com/media/news-releases and at http://news.cision.com/wartsila-corporation where the images can also be downloaded.

Wärtsilä Energy in brief
Wärtsilä Energy leads the transition towards a 100% renewable energy future. We help our partners to accelerate their decarbonisation journeys through our market-leading technologies and power system modelling expertise. These cover decarbonisation services, future-fuel enabled balancing power plants, hybrid solutions, energy storage and optimisation technology, including the GEMS Digital Energy Management Platform. Wärtsilä Energy’s lifecycle services are designed to increase efficiency, promote reliability and guarantee operational performance. Our track record comprises 76 GW of power plant capacity and 110 energy storage systems delivered to 180 countries around the world. 
https://www.wartsila.com/energy

Wärtsilä in brief
Wärtsilä is a global leader in innovative technologies and lifecycle solutions for the marine and energy markets. We emphasise innovation in sustainable technology and services to help our customers continuously improve their environmental and economic performance. Our dedicated and passionate team of 17,500 professionals in more than 240 locations in 79 countries shape the decarbonisation transformation of our industries across the globe. In 2022, Wärtsilä’s net sales totalled EUR 5.8 billion. Wärtsilä is listed on Nasdaq Helsinki.
www.wartsila.com

Energy Insights

Boy on train
21 Nov 2023 · Article
5 min read
Every Second Counts for our flexible energy future
It’s now or never to meet climate goals.
24 Oct 2023 · Article
10 min read
How shorter time resolution is the key to decarbonising energy markets
Solutions banner
24 Oct 2023 · Article
10 min read
Why proper procurement of ancillary services is key to increasing the use of renewable power
Wärtsilä Energy. Let's connect.