Parnaíba IV

Brazil

56 MW


To meet the growing power demand, Parnaíba IV has the ready option available to double its capacity by adding more engine and auxiliary modules.


Parnaiba_1008

THE CHALLENGE

Fast track project schedule

High-availability thermal capacity needed to supply ENEVA’s customer on a long-term

Remote location with challenging infrastructure to support project development and construction

Increasing future power demand

WÄRTSILÄ´S SOLUTION

Wärtsilä’s “gas to wire” solutions leverage modular design build and full EPC services

Multiple generating unit configuration mitigates the risks of outages

Established Wärtsilä presence in Brazil and extensive network of global resources

Modular architecture of Wärtsilä plants are designed for expansion fl exibility

BENEFIT

Operating power plant delivered 13 months from contract signature

Flexible and efficient power that delivers firm capacity

Wärtsilä supplied all necessary equipment, materials, goods, labor and personnel support services to complete the job

Power plant has ready option available to double its capacity by adding more engine and auxiliary modules


Energy security has become a priority in Brazil as the electric power supply has not kept pace with robust demand growth. Hydropower is the dominant source for electricity production, accounting for approximately 70% of Brazil’s installed capacity. However, droughts and diminishing reservoir levels in recent years have threatened capacity sufficiency. With supply deficits projected to occur by 2016, new thermal plants are needed to meet the country’s growing power requirements. By integrating natural gas production with power generation, ENEVA’s Parnaíba Complex in Brazil’s northeastern state of Maranhão provides access to a guaranteed fuel supply and reliable energy production.

  • Read the whole story

Main data


   Customer   ENEVA and partners
   Type   Wärtsilä 50 gas power plant
   Operating mode   Flexible baseload
   Gensets   3 x Wärtsilä 18V50SG
   Total output   56 MW
   Fuel   Natural gas
   Scope   EPC (engineering, procurement & construction)
   Delivered   2013


Related downloads


Read the Parnaíba IV success story in this brochure

A brief guide to the technical features and performance of the Wärtsilä 50SG engine.
Find in-depth info about our gas and multi-fuel power plant solutions in this brochure.

Contact info

If you want to know more about the Parnaíba IV project, please contact

Jorge Alcaide
Regional Director, Brazil
Wärtsilä Energy Solutions
+552122062500

© 2018 Wärtsilä