192 MW



kipevu-ii


The Kipevu II project is owned by the special-purpose company Tsavo Power Company Limited of Kenya, and the power plant is operated by Wärtsilä.


Wärtsilä solution
Kipevu II consists of seven Wärtsilä 38 generating sets. Wärtsilä began the construction immediately after financial closing in August 2000, and commercial operation was started on 4th September 2001, exactly on schedule.

One of the keys to the successful project was fast equipment delivery from Finland and the Netherlands. Wärtsilä showed their capabilities in total energy concepts by developing an IPP project without government guarantees in the most cost-effective way for the investors, with Kenya's Power and Lighting Company (KPLC) as the off-taker. Today Kipevu II is the lowest-cost energy producer among all the thermal projects of KPLC.

In November 2009, Wärtsilä was awarded a turnkey contract for a 117 MW thermal power plant to be located opposite to Kipevu II. The order was placed by Kenya Electricity Generating Company Limited (KenGen), the leading power generation company in Kenya. Kipevu III, consisting of seven W18V46 engines, was successfully handed over to KenGen in March 2011.



Main data

Name: Kipevu II Kipevu III
Type: Oil power plant Oil power plant
Location: Mombasa, Kenya Mombasa, Kenya
Owner: Tsavo Power Company, Kenya Kenya Electricity Generating Company Limited (KenGen)
Delivered: 2001 2011
Engines: 7 x Wärtsilä 18V38 7 x Wärtsilä 18V46
Total electrical output: 74.5 MW 117 MW

Related downloads


Read the success story in this brochure

Find in-depth info about our gas and multi-fuel power plant solutions in this brochure

Download our 2016 catalogue here


Contact info

If you want to know more about the Kipevu project, please contact

Arnaud Gouet
Regional Director, West Africa
Wärtsilä Energy Solutions
+331 47768938

© 2017 Wärtsilä