
Who | Graciólica LDA |
What | GEMS controls and optimisation software |
Where | Azores, Portugal |
days operating on 100% renewables in 2024
renewable penetration in 2024
This project represents the future direction of the global energy sector with an integrated power system combining renewables and energy storage. We appreciate Wärtsilä's professionalism in providing the software needed to expand the functionality of the microgrid to create overall system reliability and performance.
Heavy dependence on external sources for energy fuel, including high costs of importing fossil fuels to power the island’s energy grid and relative unreliability of supplies.
Wärtsilä's GEMS Digital Energy Platform seamlessly integrates various energy generation assets—combining wind, solar, energy storage and thermal generation assets—for optimised operations.
Reduced island’s reliance on imported fossil fuels and significantly cut down on greenhouse gas emissions by boosting renewable energy consumption from 15% to 60+%.
Customer | Graciólica Lda |
Site size | 6 MW / 3.2 MWh energy storage, 4.5 MW wind, 1 MW solar |
Site locations | Azores, Portugal |
Applications | Microgrid renewables integration |
Delivery | 2018 |
Read the case study to get all the project details.
Fill in a contact form and our experts aim to be in contact within 1-2 business days. Contact us »
Wärtsilä technology enables Graciólica to increase the use of renewables from 15% to 65% in the Azores
Greensmith Energy will help reduce greenhouse gas emissions in the Azores