Energía del Pacífico (EdP) is more than a power plant. It is a landmark example of how modern, flexible generation can strengthen power systems while supporting the growth of renewable energy. The facility plays a strategic role in the country's electricity system, helping balance variable renewable generation, enhance grid reliability, and contribute to lower emissions.
Inspired by the unique rhythm of the plant itself, the "Energy Symphony" (showed in the video below) project transforms real operational data into music, illustrating how thousands of engine starts, rapid ramping capabilities, frequency control, and system flexibility work together in harmony every day. The result is a powerful representation of how technology, innovation, and operational excellence support a more resilient and sustainable energy future.
As one of the most significant energy infrastructure projects in Central America, EdP demonstrates how flexible thermal generation can enable renewable integration, improve energy security, and support the decarbonisation of power systems while delivering reliable electricity when it is needed most.
What if a power plant could tell its story through music? Using real operational data from Energía del Pacífico, the Energy Symphony translates flexibility, reliability, and innovation into sound. Behind every note is a system that helps integrate renewables, strengthens grid stability, and powers El Salvador's energy transition.
| Who | Energia del Pacífico S.A. |
| What | 378MW power plant |
| Where | Acajutla, Sonsonate; El Salvador |
| How | Wärtsilä 18V50SG |
MW of electrical output.
GWh of electricity delivered per year to utilities.
Hours running a day at full baseload.
| Customer | Energía del Pacífico |
| Type | Wärtsilä 18V50SG flexible baseload power plant |
| Where | Acajutla, Sonsonate; El Salvador |
| Total output | 378 MW |
| Fuel | Natural gas |
| Scope | Engineering, procurement, construction (EPC) |
| Delivery | 2022 |
Fill in a contact form and our experts aim to be in contact within 1-2 business days. Contact us »
Read our Wärtsilä 50SG product brochure to get all the details.