Energy storage and GEMS enable intelligent renewables integration and greater energy reliability on the Caribbean island of Bonaire.
The Caribbean island of Bonaire sought to ensure the reliability of the island’s energy supply and to increase renewable energy generation. ContourGlobal Bonaire, in cooperation with Bonaire’s power company, Water en Energiebedrijf Bonaire N.V., partnered with Wärtsilä for Wärtsilä’s GEMS sophisticated energy management expertise. Bonaire now hosts a 6 MW / 6 MWh energy storage system to reduce excess energy losses by a substantial margin.
Wärtsilä’s GEMS enables customers to intelligently synchronise power assets within a hybrid system, and new resources can be easily integrated. Specifcally for Bonaire, GEMS eliminated the issues presented by renewable intermittency by using artificial intelligence and historic and real-time data to calibrate what type of generation is needed at a specific time. After completing the first phase of the project with Wärtsilä, the island has stopped curtailing excess energy losses from its wind resources, increasing annual wind energy by 6-8%.
This project is the beginning of a longer-term plan to fully modernise the island’s energy system and to add additional capacity and renewable energy generation to the grid, while setting Bonaire on the path to achieving its 100% renewable target without compromising on energy reliability.