Wärtsilä’s solution is an energy upgrade—including a new 10 MW / 26 MWh energy storage system and advanced control platform—that introduced flexibility into the local Roatan grid. While the batteries secure reliability by eliminating the need for mechanical spinning reserve, Wärtsilä’s sophisticated GEMS energy management software controls Roatan’s entire energy system, including enhancing earlier delivered Wärtsilä engines and solar panels. GEMS provides data visibility into the entire system, including load forecasting, and has enabled the optimisation of the (load) data and system assets. GEMS also enable the further integration of intermittent and variable solar and wind resources into the existing grid.