Unmatched Delivery page
Energy

at Wärtsilä the USA

Energy

Wärtsilä helps customers accelerate the transition to renewable energy through our market-leading technologies from power plants and energy storage to digital optimization and lifecycle services. Our track record includes 81 GW of delivered power capacity across 180 countries.

In the USA, Wärtsilä is helping power America’s next era of growth with flexible, reliable energy solutions built for speed, scale, and resilience.

With more than 8 GW of installed capacity across 80+ engine power plants in the United States, and more than 3 GW under execution, we bring proven technology, local expertise, and long-term service support to some of the country’s most urgent energy challenges. From data centers to utilities and industrial customers, Wärtsilä helps deliver the power needed by America today while building a smarter, more flexible path for tomorrow.

Who we are in the USA

  • 8+ GW installed power
  • Over 80 power plants
  • ~400 energy experts in the USA,
    including 100+ field technicians

    How we serve you

    • On-location service support
    • 24/7 remote support
    • Locally stored spare parts
      Pearsall Station, Texas, USA

      "Wärtsilä's solution has allowed us to respond to changes in the grid when the wind stops blowing, being able to keep the plant at peak efficiency at all times thanks to the ability to dispatch the units in increments that fit our load."
      -John Packard, Manager of Generation, STEC


      THE WIND ENABLER CONQUERS THE LONE STAR STATE

      The new energy landscape of the 21st century calls for cleaner, more sustainable energy. Texas has responded to the challenge by installing more than 12 GW of wind power, more than any other US state. However, wind power is as unpredictable as it is green.

      South Texas Electric Cooperative decided to address the unpredictability of wind power head on. The key piece of their master plan was a state-of-the-art, gas fired, 203 MW Wärtsilä 34 grid stability plant, officially named the Pearsall Power Plant but widely known in the community as The Wind Enabler.

      This backbone of the system is capable of reaching full output in eight minutes, providing 25% power in just two minutes. Icing on the cake is provided in the form of ancillary services, like black start capability and reserve power, which Pearsall can easily provide and STEC can sell on the correspondent market at a significant profit.

      Read the full story here! (PDF)

      Type Wärtsilä 34SG gas grid stability
      Operating mode Peak load / standby & emergency
      Gensets 24x W20V34SG
      Total output 203MW
      Fuel Natural gas
      Scope EEQ (Engineering & Equipment)
      Delivered 2009

      If you want to know more about the Pearsall project, please contact

      Dan Shelledy
      Business Development Manager
      Wärtsilä Power Plants
      +1 281 536 1444



        Challenge
        Solution
        Benefits