Energy

Wärtsilä power plants are the ideal solution for decentralized power production and an attractive alternative to the conventional model of centralized power plants.

Wärtsilä’s solutions are available for large plants of 500 + MW capacity. Our gas based power plants are highly flexible and offer the following benefits:

  • Substantial reduction in Carbon emission.
  • Negligible water consumption.
  • Minimal Land requirement which means saving in deforestation and displacement of people.
  • Higher efficiency leading to saving of primary energy in the power sector.
  • Reduction in investment on Transmission Network.
  • Savings in Operational & Capital costs.

Our power plants can be used for base-load applications or for peak-load needs or to complement wind energy. Our engines can handle liquid fuels such as HFO/LSHS, LFO, LBF or natural gas. Versatile dual-fuel engines can switch between liquid fuel and gas, on line. The CCHP solutions have a very low CO2 footprint, and merit status of ‘deemed renewable energy’.

We provide complete EPC solutions and lifecycle O&M support.

Wärtsilä Energy Solutions has now an installed base of more than 7000 MW with close to 384 power plants of different types in the Middle East region. This includes the largest power plant in the world, IPP3 in Jordan, powered by 38 Wärtsilä 50DF multi-fuel engines with a combined capacity of 573 MW. In recognition of its world record size, the plant has been accepted into the Guinness book of records.

We have a total installed based of 1,897.5 MW in Saudi Arabia, with a large service organisation to provide lifecycle support to customers.

  • Utilities: 310 MW
  • Cement: 879 MW
  • Industrial: 371.5 MW
  • Others: 337 MW

Leading the global energy transition

Wärtsilä leads the transition towards a 100% renewable energy future. We help our customers in decarbonisation by developing market-leading technologies. These cover future-fuel enabled balancing power plants, hybrid solutions, energy storage and optimisation technology, including the GEMS energy management platform. Wärtsilä Energy’s lifecycle services are designed to increase efficiency, promote reliability and guarantee operational performance.

Our track record comprises 74 GW of power plant capacity and more than 80 energy storage systems delivered to 180 countries around the world.

Wartsila_PowerPlant_01_MIDDAY_20k
Rethink Energy

The power sector will face dramatic changes in the next decade. These challenges will be discussed in our newly launched webcast series Rethink Energy: Navigating change in the power sector. In these webcast episodes, we will be talking to industry experts to get their perspectives on topics such as Rethinking Power Grids, Power Generation, Energy Storage, Energy Transition, and Systems Planning.

News

Wärtsilä signs Concession Agreement to develop, supply, construct, operate and maintain major 120 MW power plant project in Gabon

Sep 23, 2021, 13:00 by Wärtsilä Corporation

The technology group Wärtsilä and Gabon Power Company (GPC), the subsidiary of the Sovereign Fund of the Gabonese Republic (FGIS) dedicated to energy and water, have on 22 September 2021 signed a Concession Agreement with the Government of Gabon for the development, supply, construction, operation and maintenance of a 120 MW gas power plant. Wärtsilä, jointly leading the project development with GPC, will build the plant under a full Engineering, Procurement, and Construction (EPC) contract and will then operate and maintain the plant under a long-term 15-year Operation and Maintenance (O&M) agreement. The EPC contract and the O&M agreement will be signed in 2022 with Orinko S.A., the joint venture between Wärtsilä and GPC.

The plant will be located at the industrial site of Owendo, close to Libreville, the country’s capital. When commissioned, the plant will supply electricity to Société d’Energie et d’Eau du Gabon (SEEG), the Gabonese utility, under a 15-year Power Purchase Agreement. The project represents one of the largest of its kind in Sub-Sahara Africa and a sizeable energy infrastructure project for Gabon.

“There is currently a structural deficit between the supply capability and the demand for electricity, which is increasing year by year. This project will play an important role in bridging this deficit, and some 600,000 people will ultimately benefit from a more sustainable and economical electricity supply delivered to SEEG. The plant will replace rented generation assets by SEEG and bring significant benefits, in line with Gabon sustainability ambitions,” said Marcelin Massila Akendengue, General Director, Gabon Power Company.

“This is a major and very comprehensive project that will deliver sustainable energy at a competitive price. It highlights many of Wärtsilä’s strengths, including the efficiency and flexibility of our generating sets, our EPC capabilities, our project development skills with insight into the financing arrangements, and our lifecycle support through long-term O&M agreements,” said Nicolas Mathon, Director, Project Development, Africa and Europe, Wärtsilä Energy and Managing Director, Orinko S.A. “The project also emphasises the leadership role that Wärtsilä plays in moving the industry towards a decarbonised future by delivering solutions that enable a transition to renewable energy.”

The project is being developed under a Public Private Partnership framework, with the asset to transfer to the Gabonese authorities at the end of the concession agreement. It has the full support of the government of Gabon, with the Council of Ministers approval received in May 2021, and the Concession Agreement having received approvals by the country’s President, Prime Minister, and the relevant Ministries. When completed, the project will have a major impact on the Gabonese economy.

Wärtsilä’s installed base in West Africa comprises 440 plants with 946 engines producing 4928 MW in 34 countries. In Gabon, Wärtsilä has a long-term presence from projects delivered and contracted with SEEG and private energy intensive companies.

Learn more:

Powering Africa, the next economic hotspot
Ambitious about Africa
Powering and empowering South Africa

Media contact for more information on this release:

Mirja-Maija Santala
Manager, Marketing & Communications
Wärtsilä Energy
Mob: +358 400 793 827

mirja-maija.santala@wartsila.com

Image 1: Concession Agreement between Wärtsilä and the Government of Gabon for the development, supply, construction, operation and maintenance of a 120 MW gas power plant was signed on 22 September 2021 ©FGIS

Image 2: From left: Nicolas Mathon, Director, Project Development, Africa and Europe, Wärtsilä Energy and Managing Director, Orinko S.A and Akim Daouda, CEO of Sovereign Fund of the Gabonese Republic ©FGIS

All Wärtsilä releases are available at https://www.wartsila.com/media/news-releases and at http://news.cision.com/wartsila-corporation where also the images can be downloaded.

Wärtsilä Energy in brief
Wärtsilä Energy leads the transition towards a 100% renewable energy future. We help our customers in decarbonisation by developing market-leading technologies. These cover future-fuel enabled balancing power plants, hybrid solutions, energy storage and optimisation technology, including the GEMS energy management platform. Wärtsilä Energy’s lifecycle services are designed to increase efficiency, promote reliability and guarantee operational performance. Our track record comprises 74 GW of power plant capacity and more than 80 energy storage systems delivered to 180 countries around the world.
ttps://www.wartsila.com/energy

Wärtsilä in brief
Wärtsilä is a global leader in smart technologies and complete lifecycle solutions for the marine and energy markets. By emphasising sustainable innovation, total efficiency and data analytics, Wärtsilä maximises the environmental and economic performance of the vessels and power plants of its customers. In 2020, Wärtsilä's net sales totalled EUR 4.6 billion with approximately 18,000 employees. The company has operations in over 200 locations in more than 70 countries around the world. Wärtsilä is listed on Nasdaq Helsinki
www.wartsila.com

Contact us

Please fill in the form, we aim to respond within 1-2 business days depending on the enquiry. For an existing installation, provide all necessary details to identify the installation and the equipment. Fields indicated with an asterisk (*) are required.