Wärtsilä Energy is at the forefront of the transition towards a 100% renewable energy future. We help our customers and the power sector to accelerate their decarbonisation journeys through our market-leading technologies and power system expertise.
Our solutions include flexible engine power plants, energy storage and optimisation technology, and services for the whole lifecycle of our installations. Our engines are future-proof and can run on sustainable fuels.
Our track record comprises 79 GW of power plant capacity, of which 18 GW are under service agreements, and over 125 energy storage systems, in 180 countries around the world.
Our power system modelling expertise and on-the-ground experiences have shown that, although countries and regions have their own journeys and needs for net zero power systems, the global path to net zero is very similar.
Wärtsilä power plants are the ideal solution for decentralized power production and an attractive alternative to the conventional model of centralized power plants.
Wärtsilä's solutions are available for large plants of 500 + MW capacity. Our gas based power plants are highly flexible and offer the following benefits:
Our power plants can be used for base-load applications or for peak-load needs or to complement wind energy. Our engines can handle liquid fuels such as HFO/LSHS, LFO, LBF or natural gas. Versatile dual-fuel engines can switch between liquid fuel and gas, on line. The CCHP solutions have a very low CO2 footprint, and merit status of ‘deemed renewable energy’.
We provide complete EPC solutions and lifecycle O&M support.
Wärtsilä now has an installed base of more than 7000 MW with close to 384 power plants of different types in the Middle East region. This includes Wärtsilä's largest power plant in the world, IPP3 in Jordan, powered by 38 Wärtsilä 50DF multi-fuel engines with a combined capacity of 573 MW. In recognition of its world record size, the plant has been accepted into the Guinness book of records.
We have a total installed base of about 2 GW in Saudi Arabia, with a large service organisation to provide lifecycle support to customers.
Wärtsilä leads the transition towards a 100% renewable energy future. We help our customers in decarbonisation by developing market-leading technologies. These cover future-fuel enabled balancing power plants, hybrid solutions, energy storage and optimisation technology, including the GEMS energy management platform. Wärtsilä Energy’s lifecycle services are designed to increase efficiency, promote reliability and guarantee operational performance.
Our track record comprises 74 GW of power plant capacity and more than 80 energy storage systems delivered to 180 countries around the world.
The power sector will face dramatic changes in the next decade. These challenges will be discussed in our newly launched webcast series Rethink Energy: Navigating change in the power sector. In these webcast episodes, we will be talking to industry experts to get their perspectives on topics such as Rethinking Power Grids, Power Generation, Energy Storage, Energy Transition, and Systems Planning.
The market leading Wärtsilä 50DF marine engine has been successfully tested and certified to run on ethane (LEG) fuel. The extensive and successful testing programme was carried out by Wärtsilä in close collaboration with Evergas, a world renowned owner and operator of seaborne petrochemical and liquid gas transport vessels.
“We are very pleased that the Wärtsilä engines will be capable of utilising ethane boil-off gas as fuel. It increases our operational efficiency and improves flexibility in the bunkering of fuels. All in all it results in a significant reduction in operating costs, while also providing a minimal environmental footprint. It also enables us to offer our customers increased flexibility, which has a monetary value to them,” says Mr Steffen Jacobsen, the CEO of Evergas.
The capability to efficiently burn ethane boil-off gas as engine fuel significantly reduces the need of gas re-liquefaction during the voyage. This means that less power is needed for the cargo handling, thus providing a more efficient and environmentally sound overall system.
This technological breakthrough enables Wärtsilä's customers to meet the International Maritime Organization’s (IMO) Tier III regulations without need of secondary emissions cleaning while using either LNG or LEG as fuel. The engines have the capability to seamlessly switch between Liquified Natural Gas (LNG), Ethane (LEG), Light Fuel Oil (LFO) or Heavy Fuel Oil (HFO) without the need for any modifications to hardware and with uninterrupted operation, thereby setting a new standard in fuel flexibility.
“This is yet another significant breakthrough for Wärtsilä’s multi-fuel technology. The option to utilise ethane gas as a marine fuel further extends the fuel flexibility of our DF engine portfolio. It also provides yet another option to achieve compliance with the IMO’s stringent Tier III legislation,” says Lars Anderson, Vice President, Engine Sales, Wärtsilä Ship Power.
Link to more information about the Wärtsilä 50DF engine:Wärtsilä is showcasing a wide offering of industry-leading innovative products and solutions at OTC exhibition in Houston, USA at stand # 5701, during 4-7 May.
Media contacts:
Mr Lars Anderson
Vice President, Engine Sales, Ship Power
Wärtsilä Corporation
Tel: +65 6265 9122
lars.anderson@wartsila.com
Ms Marit Holmlund-Sund
Senior Manager Marketing, Communications, Ship Power
Wärtsilä Corporation
Tel: +358 10 709 1439
marit.holmlund-sund@wartsila.com
Wärtsilä in brief:
Wärtsilä is a global leader in complete lifecycle power solutions for the marine and energy markets. By emphasising technological innovation and total efficiency, Wärtsilä maximizes
the environmental and economic performance of the vessels and power plants of its customers.
In 2014, Wärtsilä's net sales totalled EUR 4.8 billion with approximately 17,700 employees. The company has operations in more than 200 locations
in nearly 70 countries around the world. Wärtsilä is listed on the NASDAQ OMX Helsinki, Finland.
www.wartsila.com
Please fill in the form, we aim to respond within 1-2 business days depending on the enquiry. For an existing installation, provide all necessary details to identify the installation and the equipment. Fields indicated with an asterisk (*) are required.