Let Wärtsilä retrofit your BWMS
Get your ship compliant
Book Wärtsilä to retrofit your BWMS

Retrofitting your Ballast Water Treatment System

IMO's deadline for compliance to D2 regulation is nearing rapidly: 8 September 2024!

As ship owner or operator you have no other option than to upgrade your vessel (or fleet) to this new international standard for ballast water treatment. There is a fair chance that at this point you are under time pressure to make this upgrade happen, having little clue where to start. Good news! We are here to help you retrofit your BWMS and make your ship compliant again in time.

Our team has decades of expertise and our retrofit offer is one of the most complete ones in the market. We offer BWMS retrofit packages for small to very large ships, including solutions for ATEX zones. Skip long delivery times, get in touch and make an appointment.


retrofit of bwms by Wärtilä Water & Waste
 
Skip long delivery times and book us for a retrofit!
 

Contact us

Ballast water management systems on stock or with short delivery times

Please fill in the form. We aim to respond within 1-2 business days, depending on the enquiry. For an existing ballast water installation, provide all necessary details to identify the installation and the equipment. Fields indicated with an asterisk (*) are required.

CALL: +44 1202 662 600 
EMAILwaw.sales@wartsila.com.

Required by IMO

The International Maritime Organisation (IMO) introduced in 2004 the Ballast Water Code (BWC) to address the Control and Management of Ships’ Ballast Water and Sediments for all sea going ships greater than 400 gt using ballast water. The Ballast Water Management Convention (BWMC) entered into force 8 September 2017. Ships are required to manage their ballast tanks to remove or render harmless the ballast water discharge of invasive species.

Our experience and in-depth knowledge about vessels and marine engineering allow us to have a optimal understanding of the environment in which a Ballast Water Management System is going to be installed. With our technical assessment of BWMS for your specific vessel, we are capable of showing potential equipment locations, installation paths, electrical cabinet locations. Our team of engineers can also make recommendations for what should be considered during installation.

We realize that equipment operations are essential and that problems and down-time have an effect on the owners bottom line. We believe that a single supplier for the entire design process, equipment supply and installation support is beneficial to the ship owner, both in terms of cost and efficiency. Communication across different disciplines is proven more efficient when exchanged within the same company.

© 2022 Wärtsilä