Prysmian Group

The Prysmian Group enhanced its turnkey submarine power cable installation services and Wärtsilä supplied the equipment needed to convert their Cable Enterprise barge into an independently operating cable-laying vessel. Wärtsilä’s equipment delivery included two Wärtsilä 26 main engines and 8 MW of power generation for six new thrusters, a switchboard, and power management systems. The cable-laying speed is now 10 times faster than a conventional barge.

Read more about the case (PDF)
© 2018 Wärtsilä