M/S Artania

The old engines of the M/S Artania cruise ship were reaching the end of their lifecycle. Wärtsilä was chosen to deliver four new 12V32 main engines and one auxiliary generator set to extend the vessel’s operations. The power upgrade drastically reduced the lube oil consumption by almost 70 per cent, increased the comfort of the passengers, reduced emissions and increased operational reliability and safety.

Read more about the case (PDF)

© 2018 Wärtsilä