IPP3 power plant

The Amman Asia Electric Power Company recommissioned the engines of the world’s largest combustion engine power plant for gas operation. This has resulted in an increased plant load factor by 3.5%, savings in operational costs, because it is not necessary to operate the SCR system anymore. The operational savings, by not having to purchase urea, amount to approximately USD 52,000 per day.

Read more about the case (PDF)
“We have achieved full flexibility in our IPP3 power plant. This means that we can now fulfill our power production agreement with an improved economy and significantly smaller environmental footprint,”

Mr. Jubok Lee, Operation Director of AAEPC.