Wärtsilä 32 grid stability/emergency liquid fuel power
Always ready to deliver power to the grid instantly and efficiently in any operating profile makes this plant perfect for peaking and reserve power applications.
- Ultra fast start capability provides megawatts to the grid in seconds and full plant output in less than 3 minutes
- Able to provide non-spinning secondary reserve thanks to a 20-second ultra fast sync time
- Able to provide grid blackstart capability and re-energize a grid
- Extremely low standby consumption, <1 kW per MW of installed power
- Genset is easily transported in one piece to challenging locations