BC ferries

VEAS, Asker (Norway)

 

The new facility will comprise a biogas upgrading and liquefaction plant. It will enable VEAS to produce biogas creating an alternative to fossil fuels and reducing CO2 emissions.

The new bioLNG plant will be incorporated together with the company’s existing biogas plant. The total bioLNG production capacity will be 20 tons per day.

The scope of supply for the bioLNG plant includes upgrading of the biogas, hot water production, liquefaction, storage and truck loading capability.

Wärtsilä is delivering the system on a fast-track basis, and the on-site installation is scheduled to be completed within a 14-month time-frame. The plant is expected to become in commercial operation during 2020.

 

Contact us

Please fill in the form, we aim to respond within 1-2 business days depending on the enquiry. For an existing installation, provide all necessary details to identify the installation and the equipment. Fields indicated with an asterisk (*) are required. 

Find your local Wärtsilä office here

© 2020 Wärtsilä