Kohinoor Energy

The original turbochargers installed at the Kohinoor power plant in Pakistan had reached their expected service life-cycle. Replacing key components would cause significant costs. Instead of an overhaul, Wärtsilä offered a retrofit solution which would bring higher efficiency and lower fuel oil consumption. A contract was subsequently made to deliver and install eight TPL 76C turbochargers.

Read more about the case (PDF)

Read more about the solution

  • Kohinoor Energy