Transition-Lab-weekly-updates
WETL UPDATES
Read the latest updates from the Wärtsilä Energy Transition Lab
Energy-transition-lab
European electricity market responds to Covid-19
Wärtsilä Energy transition lab

Wärtsilä Energy Transition Lab COVID-19 CO2 emissions scorecard

The impact of the pandemic alongside the phase-out of coal in certain European markets accelerated the pace of the electricity system transition across the continent, with the share of renewables reaching levels not expected for another 10 years. Our scorecard highlights the leaders and laggards across the continent.

Updates from the Wärtsilä Energy Transition Lab

Ireland showing the way towards a high renewable energy future

6 August 2020

Read the complete update »

A wind of change from Spain

30 July 2020

Read the complete update »

How the ongoing pandemic and WETL can help us to plan the future energy system

23 July 2020

Read the complete update »

A new normal for the energy industry

16 July 2020

Read the complete update »

The Mediterranean Diet for the Energy Industry

9 July 2020

Read the complete update »

The lessons of Covid-19 pandemic for the European electricity market

7 July 2020

Read the complete update »

Get notified of the latest updates

More WETL related articles

 

Falling like dominos

– Europe’s renewable energy records continue to topple

LinkedIn Article
Matti Rautkivi  Check out the LinkedIn profile

 

Read the article »

COVID-19 highlights

– vital role for storage in unlocking 100% renewable energy future

LinkedIn Article
Ville Rimali  Check out the LinkedIn profile

 

Read the article »

Germany’s record-breaking renewables expose lack of flexibility


LinkedIn Article
Björn Ullbro  Check out the LinkedIn profile

 

Read the article »

How green energy can drive post-Covid-19 growth

Twentyfour7
magazine


Read the article »

Contact us

Please fill in the form, we aim to respond within 1-2 business days depending on the enquiry. For an existing installation, provide all necessary details to identify the installation and the equipment. Fields indicated with an asterisk (*) are required. 

Find your local Wärtsilä office here

© 2021 Wärtsilä