Dragon LNG terminal, UK
Dragon LNG’s terminal in Milford Haven, Wales, has
been in operation since 2009 and has two 163,000m3
capacity LNG storage tanks. In times of demand, the
liquefied gas is pressurized, regasified and delivered to
customers via the National Gas Transmission System
(NTS). When gas is not required for delivery, the boil-off
gas (BOG) from the storage tanks is utilized for on-site
power and steam production.