Comparing Various LNG to Power Solutions for Myanmar

WHITE PAPER

Comparing Various LNG to Power Solutions for Myanmar




Comparing Various LNG to Power Solutions for Myanmar


powergen_asia_commended_paper

Firstly, in this paper, we will study Myanmar’s current power system as well as the potential locations of new generation vs. existing gas pipeline. Based on this we will recommend a few places where combined LNG terminals and Power Plants could be built.

Secondly, this paper will study the various possible LNG terminal solutions, both onshore and off-shore, and corresponding LNG logistics. Each of these conceptual solutions will be compared based on the cost of generated electricity. Finally, this paper will present a sensitivity analysis which can be used to compare the various unknowns in the LNG value chain. This can be used to prepare for site differences and future changes in the LNG supply chain and prices.

Contact us


Nicolas Leong


Nicolas Leong

Business Development Manager, South East Asia
Wärtsilä Energy Solutions
+65 8339 5334


John Reinlund


John Reinlund

Business Analyst
LNG Infrastructure solutions
Wärtsilä Energy Solutions
‭+358 40 964 8996



© 2018 Wärtsilä