ES-references_slide_2016

References

Powering the world


United Ashuganj

Bangladesh

200 MW



”In a developing economy like Bangladesh where you will always have erratic demand for electricity use, you have to have these kinds of modular plants which can ramp production up and down within minutes. Absolutely, this is going to be the future.”

- Moinuddin Hasan Rashid, Managing Director of United Enterprises & Co. Ltd.

Bangladesh_1008_

graphic_Bangladesh

Both for Wärtsilä and for Bangladesh, the United Ashuganj 200 MW modular power plant project is a true ground-breaker. Not only is it the first public-private partnership (PPP) in the nation’s energy sector, it will introduce a type of co-generation plant never before seen in the country. It is also Wärtsilä’s largest single power plant project in Asia to date. 

Chronic constraints in fuel supply, coupled with outdated and inefficient infrastructure, have meant that blackouts and brownouts are common in the country of 150 million. 
  • Read the whole story

Main data


   Customer   United Ashuganj Energy Ltd. (IPP)
   Type   Wärtsilä 34 gas power plant
   Operating mode   Flexible baseload
   Gensets   20 x Wärtsilä 20V34SG 
   Total output   195 MW
   Fuel   Natural gas 
   Scope   EEQ (Engineered Equipment Delivery)
   Delivered   2015


Related downloads


Read the success story in this brochure

Smart Power Generation is a unique combination of features offering excellent operational flexibility...

Download our 2016 catalogue here


Contact info

If you want to know more about the United Ashuganj project, please contact

Göran Richardsson
Sales Director, Asia Region
Wärtsilä Energy Solutions
+358107091524

© 2017 Wärtsilä