In this section you can find a summary of Wärtsilä's announced orders. For information on orders received before 2012, please visit the press release archive.
Download the announced orders table in excel: Announced orders 20kb »
| Date | Business | Customer | Scope of supply | Size/Value | Order booked |
|---|---|---|---|---|---|
| 15.5.2013 | Services | Ndola Energy Company Ltd, Zambia | Ten-year Operations & Maintenance (O&M) agreement for power plant Link to release |
Q2 2013 |
|
| 3.5.2013 | Power Plants | Teollisuuden Voima Oyj, Finland |
Nine Wärtsilä 32-engines and auxiliaray equipment to be used as emergency power for nuclear power plant |
Q2 2013 |
|
| 29.4.2013 | Services | Central Termica de Ressano Garcia, Mozambique | Three-year operations and maintenance agreement for power plant running on natural gas Link to release |
Q2 2013 |
|
| 17.4.2013 | Ship Power | Axis Offshore, Singapore | Fully integrated power, propulsion and positioning system for a DP3 Dynamically Positioned offshore accommodation rig Link to release |
Q1 2013 | |
| 16.4.2013 | Ship Power | Statoil, Norway and AET Tanker Holdings, Singapore | Inert gas systems for a Floating Storage Unit (FSU) and for two shuttle tankers that will support the FSU Link to release |
Q1 2013 | |
| 15.4.2013 | Ship Power | Evergas, Denmark | Comprehensive solutions package for a series of Liquefied Natural Gas (LNG) Carriers Link to release |
Q1 2013 | |
| 8.4.2013 | Ship Power | Bumi Armada Berhad, Malaysia | Design and power for a series of four multi-purpose platform support vessels (MPSVs) Link to release |
Q1 2013 | |
| 14.3.2013 | Services | Viking Line, Finland | Maintaining and servicing 'Viking Grace', the largest passenger ferry to operate on LNG Link to release |
Q1 2013 | |
| 11.3.2013 | Ship Power | Statoil, Norway | Series of pumps to be installed on a new floating storage unit (FSU) Link to release |
Q1 2013 | |
| 26.2.2013 | Ship Power | Ignazio Messina & Co, Italy | Exhaust gas cleaning systems for four new Container Ro/Ro (ConRo) vessels Link to release |
Q1 2013 | |
| 4.2.2013 | Power Plants | Portland General Electric Company, USA | 12 Wärtsilä 50SG natural gas fuelled engines and related auxiliary equipment for a power plant in Oregon, USA Link to release |
220 MW |
Q1 2013 |
| 25.1.2013 | Ship Power | NA | Repeat order to provide a hybrid exhaust gas cleaning and SCR system Link to release |
Q4 2012 |
|
| 21.1.2013 | Ship Power | Lloyds Banking Group, Scotland | Main engines and auxiliary generating sets for new RoPax ferry Link to release |
Q4 2012 |
|
| 9.1.2013 | Services | KEPCO Plant Service & Engineering Co., Ltd, Jordan | Two long-term service agreements covering Amman Asia Electric Power’s power plant in Al Manakher, Jordan Link to release |
Q4 2012 |
|
| 8.1.2013 | Power Plants | South Texas Electric Cooperative (STEC), USA | Large power plant equipped with 12 Wärtsilä 50SG engines running on natural gas Link to release |
225 MW |
Q4 2012 |
| 2.1.2013 | Power Plants | AES Corporation, US, plant to be built in Jordan |
Major power plant running on a total of 16 Wärtsilä 50DF dual-fuel engines Link to release |
EUR 184 million |
Q1 2013 |
| 31.12.2012 | Ship Power | Anthony Veder, the Netherlands | Complete dual-fuel propulsion package for two new Liquefied Ethylene Gas (LEG)/Liquefied Petroleum Gas (LPG) tankers Link to release |
Q3 2012 | |
| 19.12.2012 | Ship Power | Hyundai Heavy Industries (HHI), Korea | Design of a new diving support vessel (DSV) Link to release |
Q4 2012 | |
| 19.12.2012 | Ship Power | China Oilfield Services Ltd (COSL), China | Designs for a total of six new ships; two Platform Supply Vessels (PSVs) and four Anchor Handling Tug Supply (AHTS) vessels Link to release |
Q4 2012 | |
| 13.12.2012 | Power Plants | South African joint venture Central Termica de Ressano Garcia, Mozambique | Major gas fuelled power plant powered by a total of 18 Wärtsilä 34SG engines running on natural gas Link to release |
Value EUR 138 million |
Q4 2012 |
| 11.12.2012 | Services | Guyana Power & Light, Inc, Guyana | Extension to the Operations & Maintenance (O&M) agreements of three power plants and standadization of frequency output for one power plant Link to release |
80 MW |
Q4 2012 |
| 7.12.2012 | Ship Power | Harvey Gulf International Marine, USA | Complete liquefied natural gas (LNG) package, including the propulsion, auxiliaries and controls, for a new offshore support vessel Link to release |
Q4 2012 | |
| 3.12.2012 | Ship Power | Société des traversiers du Québec (STQ), Canada | Propulsion machinery, gas storage and handling systems for a new gas-powered passenger ferry Link to release |
Q4 2012 | |
| 28.11.2012 | Ship Power | Siem Offshore, Norway | Ship design services as well as power and propulsion system for a newbuild LNG powered Platform Supply Vessel (PSV) Link to release |
Q4 2012 | |
| 22.11.2012 | Ship Power | ECOVIX, Brazil | Generating sets and thrusters for three new drill ships each to be powered by six Wärtsilä 32 generating sets and six Wärtsilä underwater de-mountable thrusters Link to release |
Q4 2012 | |
| 15.11.2012 | Services | United Cement Company (UniCem), Nigeria | Operations & Maintenance (O&M) agreement for 3 years for power plant powered by three Wärtsilä 50DF dual-fuel engines Link to release |
Q4 2012 | |
| 6.11.2012 |
Ship Power |
Kuwait Oil Company, Kuwait |
Engines and complete propulsion systems for two newbuild vessel projects. The order includes a total of 28 engines for 14 vessels and Condition Based Maintenance (CBM) systems for each vessel. Link to release |
Q3 2012 | |
| 30.10.2012 | Power Plants | Société Mauritanienne d'Electricité (Somelec), Mauritania | Dual-fuel power plant powered by eight Wärtsilä 50DF generating sets, which are able to run on both natural gas and conventional liquid fuels Link to release |
Value EUR 128 million |
Q4 2012 |
| 25.10.2012 | Ship Power | Vyborg Shipyard JSC, Russia | Integrated power and automation systems for two new icebreakers Link to release |
Q4 2012 |
|
| 15.10.2012 | Ship Power | Jurong Shipyard Pte Ltd | Main generating engines and thrusters for six new deep water drill ships Link to release |
Q3 2012 |
|
| 12.10.2012 |
Ship Power |
Dalian Shipbuilding Industry Company and Shipbuilding Heavy Industry Co. Ltd., Singapore | Wärtsilä X72 engines and equipment for four container vessels and two bulk carriers Link to release |
Q3 2012 |
|
| 10.10.2012 | Power Plants | Amman Asi Electric Power Company, Jordan | EPC (Engineering, Procurement, Construction) power plant which will powered by a total of 38 Wärtsilä 50DF multi-fuel engines Link to release |
573 MW | Q3/2012 |
| 19.9.2012 | Ship Power | Exmar Shipping SA | Cargo handling equipment and engineering to four medium size carriers Link to release |
Q2/2012 | |
| 23.8.2012 | Power Plants | EDL NGD (NT) Pty Ltd, Australia |
Gas power plant expansion with six Wärtsilä 34SG engines and the related engineering services. |
53 MW | Q3/2012 |
| 16.8.2012 | Ship Power | Svitzer Australia Pty Ltd, Australia |
Power system for four diesel-electric power tugs, each fitted with two 9-cylinder and one 8-cylinder in-line Wärtsilä 20 engines. |
Q2/2012 | |
| 1.8.2012 | Ship Power | Eiffage Consortium, Nigeria | Sewage treatment plant for an accommodation platform Link to release |
Q1 2012 | |
| 25.7.2012 | Ship Power | Kleven Maritime AS, Norway | Ship designs for three new platform supply vessels (PSVs) and power and propulsion, electrical and automation systems for two of the vessels Link to release |
Q3 2012 | |
| 20.7.2012 | Services | Gulf Energy Ltd, Kenya | Operations & Maintenance (O&M) agreement for 10 years for power plant Link to release |
Q3 2012 | |
| 19.7.2012 | Ship Power | Kuwait Petroleum Corporation | Wärtsilä RT-flex main engines for four VLCCs, one Aframax tanker and four medium-range tankers Link to release |
Q1-Q2 2012 | |
| 17.7.2012 | Power Plants | Azerenerji JSC, Azerbaijan | Gas power plant with 21 Wärtsilä 50SG engines, related auxiliaries and process equipment Link to release |
384 MW |
Q2 2012 |
| 11.7.2012 | Ship Power | CNOOC Energy Technology & Services Limited (CETS), China | Main engines running on gas (LNG) for two tug boats, each powered by two 6-cylinder Wärtsilä 34 dual-fuel engines Link to release |
Q3 2012 |
|
| 10.7.2012 | Services | Consortium, Puri Akraya Engineering | Long-term operations and maintenance agreement for power plant in Timor-Leste powered by seven Wärtsilä 46 engines Link to release |
120 MW | Q2 2012 |
| 9.7.2012 | Services | Princess Cruise Lines Ltd | Long-term service agreement for seven vessels powered by Wärtsilä 46 engines Link to release |
270 MW |
Q2 2012 |
| 6.7.2012 |
Ship Power |
GE Oil & Gas |
Firefighting system handling seawater Link to release |
Q1 2012 |
|
| 4.7.2012 | Ship Power | Pacific Radiance Ltd., Singapore | Complete and fully integrated power generation and propulsion packages for three offshore vessels. Link to release |
Q2 2012 | |
| 3.7.2012 | Power Plants | PT. PP (Persero) Tbk, Indonesia | Combustion gas engine baseload power plant with seven Wärtsilä 50DF dual-fuel engines, as well as associated auxiliaries and engineering services. Link to release |
113 MW |
Q2 2012 |
| 29.6.2012 | Ship Power | Petrobras, Brazil | Integrated power solutions for 6 new offshore Pipe Laying Vessels (PLVs) Link to release |
Majority before Q2 2012 | |
| 25.6.2012 | Ship Power | Fincantieri Cantieri Navali Italiani S.p.A., Italy | 2 Membrane BioReactors (waste water systems) to a 141,000 gt newbuilding for Carnival group member P&O Cruises Link to release |
Q1 2012 | |
| 21.5.2012 | Ship Power | Ecovix-Engevix Construções Oceânicas S.A., Brazil | Inert Gas Generator units to eight FPSO vessels Link to release |
Q2 2012 | |
| 14.5.2012 | Ship Power | Petrobras, Brazil | Flare Gas Recovery packages to four FPSO units Link to release |
Q1 2012 | |
| 14.5.2012 | Services | Sasol New Energy Holdings, South Africa | Three year Operations & Maintenance (O&M) agreement for the 180 MW Sasol New Energy plant. Link to release |
Q2 2012 | |
| 8.5.2012 |
Ship Power |
ECO2 Inland Vessel project, Koedood Diesel Service BV | Complete power system, including two of its 6-cylinder Wärtsilä 20DF dual-fuel medium-speed engines, for a new dry cargo inland waterway vessel. Link to release |
Q2 2012 | |
| 24.4.2012 | Ship Power | Wilhelmsen ASA, Norway | Krystallon Exhaust Gas Cleaning System retrofit Link to release |
Q2 2012 | |
| 20.4.2012 | Ship Power | BP Australia | Firewater pump system Link to release |
Q4 2011 | |
| 2.4.2012 | Ship Power | Höegh LNG | LNG regasification technology for the Höegh LNG Floating Storage and Regasification Unit Link to release |
Q1 2012 | |
| 26.3.2012 | Ship Power | Korean government Incheon Port Authority Guideship | Wärtsilä 20DF dual-fuelled engine with 9 cylinders. Link to release |
Q4 2011 | |
| 15.3.2012 | Services | Prestige Cruise Holdings, Inc., USA | Five-year service agreement covering six vessels, a total of 27 Wärtsilä engines. Option to include further vessels in the future. Link to release |
Q1 2012 | |
| 13.3.2012 | Power Plants | Matanuska Electric Association, Alaska | Engineering and generating equipment, scope of supply includes ten 18-cylinder Wärtsilä 50DF dual-fuel generating sets. Link to release |
Value USD 106 million |
Q1 2012 |
| 9.3.2012 | Ship Power | BP | ST8 series sewage treatment unit to the Quad 204 FPSO project for BP Link to release |
Q4 2011 | |
| 8.3.2012 | Power Plants | PT Perusahaan Listrik Negara, Indonesia | Scope of supply eleven 20-cylinder Wärtsilä 34SG gas fuelled generator sets in V-configuration and necessary auxiliary equipment as well as building materials. Link to release |
Output 110 MW |
Q1 2012 |
| 7.3.2012 | Power Plants | Société Générale d’Enérgie S.A. (Sogener), Haiti | Extension to an existing power plant, scope of supply two 20-cylinder Wärtsilä 32 liquid fuel based generator sets together with auxiliaries, engineering, and supervision of the installation. Link to release |
Q1 2012 | |
| 2.3.2012 | Ship Power | Biogas liquefaction plant, including feed gas compression, biogas cleaning & liquefaction and liquid biogas storage and export Link to release |
Q1 2012 |
||
| 1.3.2012 | Services | Energética Suape II SA, Brazil | Three-year operations & management (O&M) agreement signed for the 380 MW Suape II power plant, equipped with seventeen 20-cylinder Wärtsilä 46F engines. Option for renewal. Link to release |
Q1 2012 | |
| 17.2.2012 | Ship Power | Harvey Gulf International Marine, USA | Integrated system including dual-fuel machinery, an electrical and automation package, complete propulsion equipment, and the LNG fuel storage and gas conditioning system. Link to release |
Q1 2012 | |
| 25.1.2012 | Ship Power | Algoma Central Corporation, Canada | Fresh water integrated scrubbers for a series of six vessels with an option for a further two, being built to transport bulk commodities on North America’s Great Lakes and St. Lawrence Seaway. Link to release |
Q1 2012 | |
| 23.1.2012 | Ship Power | Songa Offshore AS, Norway | Power and positioning system for two new drilling rigs, scope of supply for each rig includes six 12-cylinder Wärtsilä 32 engines in V-configuration with ancillaries, and six Wärtsilä FS3500 main steerable thrusters, as well as the integration of the entire system. Link to release |
Q1 2012 | |
| 12.1.2012 |
Power Plants |
Ace Alliance Power Ltd, Raj-Lanka Power Company & Max-Lanka Power Ltd; Bangladesh | Three contracts to supply power plant generating equipment to Bangladesh. Scope of supply: - seventeen 20-cylinder Wärtsilä 32 engines and auxiliary units - six 20-cylinder Wärtsilä 32 generating sets with auxiliaries - six 20-cylinder Wärtsilä 32 engines with auxiliary units Liquid fuel operation, switch to gas based operation when fuel available. Link to release |
Overall output 250 MW. |
Q4 2011 |
| 10.1.2012 | Power Plants | PowerPac Mutiara Jamalpur Power Plant Ltd, Bangladesh | Two contracts to supply power plant generating equipment to Bangladesh. Scope of supply: - twelve 20-cylinder Wärtsilä 32 generating sets - six 18-cylinder Wärtsilä 46 engines in V-configuration and auxiliary equipment Liquid fuel operation, switch to gas based operation when fuel available. Link to release |
Overall output 200 MW. |
Q4 2011 |